August 24, 2026
TL;DR: HEATFLAM prepared a customized 750 kW industrial combustion system for an automotive project in Thailand. The project video shows…
阅读更多 →
August 21, 2026
TL;DR: Two senior HEATFLAM engineers carried out pre-shipment technical testing on a 14,000,000 kcal/h combustion system for gypsum powder drying…
阅读更多 →
August 20, 2026
TL;DR: HEATFLAM built a custom 300,000 kcal/h industrial combustion system for a catalytic waste-gas treatment project serving an automotive parts…
阅读更多 →
August 19, 2026
TL;DR: HEATFLAM is preparing a 14,000,000 kcal/h gypsum powder drying combustion system for delivery to Spain. Two senior engineers are…
阅读更多 →
August 18, 2026
TL;DR: This 700 kW natural gas automotive oven combustion system was documented during pre-shipment preparation. The assembly combines the burner…
阅读更多 →
August 17, 2026
TL;DR: This Vietnam automotive project combined a Riello HTDR burner system, an engineered industrial gas train, a control cabinet, and…
阅读更多 →
August 14, 2026
TL;DR: This Tianjin project uses a HEATFLAM customized natural gas combustion system to supply heat for an automotive electrophoretic coating,…
阅读更多 →
August 12, 2026
TL;DR: Heatflam prepared three customized industrial burner systems for a gypsum board drying project in Somalia. The project set includes…
阅读更多 →
August 11, 2026
TL;DR: This project case presents a customized 1,250,000 kcal/h combustion system for waste incineration. The extended skid-mounted package brings together…
阅读更多 →
August 10, 2026
TL;DR: Industrial burner selection starts with the process heat balance, not a catalogue model number. Define the duty, fuel, maximum…
阅读更多 →