News

Industrial Combustion System Testing: HEATFLAM’s Pre-Delivery Engineering Review

October 12, 2026
TL;DR: Industrial combustion system testing should verify the assembled fuel, air, ignition, control, and safety functions against a documented acceptance…
阅读更多 →

Gypsum Board Combustion System Commissioning | Heatflam

October 10, 2026
TL;DR: Heatflam’s on-site work for a gypsum board production application focuses on the interfaces among the burner, fuel supply, combustion…
阅读更多 →

Industrial Combustion System for Feed Drying: Engineering, Assembly & Process Control

October 9, 2026
TL;DR: A feed dryer needs a combustion system matched to its moisture load, airflow path, fuel supply and control method.…
阅读更多 →

How Industrial Combustion Systems Are Assembled: Fuel Train, Controls & System Integration

October 8, 2026
TL;DR: Industrial combustion system assembly brings the burner, fuel train, pressure monitoring, air and fuel modulation, and burner control system…
阅读更多 →

Custom 1350 kW Combustion System for RTO Applications

September 24, 2026
TL;DR: This project is a customized natural-gas combustion system engineered for an RTO application. The burner nameplate lists a 1,350…
阅读更多 →

Honeywell Combustion System Inspection & Custom Engineering for Industrial Applications

September 23, 2026
TL;DR: A Honeywell combustion system has arrived at HEATFLAM for incoming inspection and preparation for customer-specific engineering. The next steps…
阅读更多 →

CAH160 Burner System Components: Wiring and Gas Piping Close-Up

September 16, 2026
TL;DR: This close-up of CAH160 burner system components features one of six same-model systems being prepared for an aquafeed drying…
阅读更多 →

6 CAH160 Burner Systems for Aquafeed Drying: Denmark Project

September 14, 2026
TL;DR: HEATFLAM is preparing six CAH160 burner systems for an aquafeed drying project in Denmark. Engineers are wiring the systems…
阅读更多 →

HEATFLAM at IRGCE 2026: Industrial Combustion Solutions for Rubber Glove Manufacturing

September 11, 2026
TL;DR: HEATFLAM joined IRGCE 2026 at Booth 438A, Hall 4, to discuss industrial combustion solutions for rubber glove manufacturing. Our…
阅读更多 →

Industrial Combustion Solutions for Rubber Glove Manufacturing at IRGCE 2026

September 8, 2026
TL;DR: Meet Heatflam at IRGCE 2026, Hall 4, Booth 438A, to discuss industrial burners for rubber glove manufacturing, customized heating…
阅读更多 →