Grain, Seed, Timber, Paper Industry
Engineered Solution

Grain, Seed, Timber, Paper Industry

Our industrial combustion system solution for the Grain, Seed, Timber, and Paper Industry focuses on delivering targeted, material-adapted thermal support—achieving…

Max Efficiency

Optimized combustion ratios for fuel savings.

Eco Compliant

Meets strict NOx & CO emission standards.

Low OPEX

Reduced maintenance and operational costs.

Applications

Tailored for Every Scenario

Whether upgrading an existing facility or designing a new plant, our solutions adapt to your specific operational constraints.

System Retrofit

Upgrade existing boilers/furnaces without changing the main structure.

  • Seamless flange matching
  • BMS integration

Greenfield Projects

Complete combustion system design from gas train to exhaust.

  • Full skid fabrication
  • Turnkey installation

Fuel Conversion

Switch from heavy oil/coal to NG, LPG, or Hydrogen blends.

  • Dual-fuel capability
  • Cost analysis support

Low NOx Upgrade

Meet the strictest environmental regulations (EU/China standards).

  • < 30mg NOx Guarantee
  • FGR implementation
Core Technology

Engineered for Precision Control

Our industrial combustion system solution for the Grain, Seed, Timber, and Paper Industry focuses on delivering targeted, material-adapted thermal support—achieving efficient moisture evaporation or process heating via clean, stable combustion that generates regulated hot air, transferred to materials through optimized heat exchangers, while integrating a cohesive system of combustion, hot air generation, transfer, and intelligent control to adapt to varying material properties (e.g., moisture content, thermal sensitivity) and production loads, balancing energy efficiency, low-emission compliance, and consistent process performance to safeguard product quality and operational reliability.
Product Matrix

Recommended Equipment

Why Choose Us

Proven Performance

ISO 9001 Certified
CE / UL Compliant
Contact us for case studies relevant to your industry.
FAQ

Common Questions

What is the typical lead time for a custom system?
Standard burners ship within 2-4 weeks. Fully customized skid-mounted systems typically require 8-12 weeks for engineering, fabrication, and testing.
Do you offer on-site commissioning?
Yes, our global engineering team is available for on-site installation guidance, combustion tuning, and operator training to ensure optimal performance.
Are these systems compatible with hydrogen?
Many of our burner platforms are "H2-Ready" for blends up to 20-100% hydrogen. Please consult our engineering team for specific fuel composition requirements.
What warranty do you provide?
We offer a standard 12-month warranty on all equipment, extendable via service contracts. All core components use premium brands (Siemens, Honeywell) for long-term reliability.

Ready to Optimize Your Process?

Get a custom engineering proposal tailored to your specific fuel, capacity, and emission requirements.